Project Overview
This publicly bid renovation of existing sports fields consisted of a large multi-tiered and multiphased project that broke ground in May of 2016 and was completed in the spring of 2017.
The project involved substantial earthwork along with rapid impact compaction. Contaminated soils required a full time LSRP for the construction of a multi-tiered layout to accommodate the upper tier synthetic turf stadium field and lower tier multipurpose synthetic turf field. The facility also required a very detailed and intricate transition utilizing large retaining wall systems, Musco sports lighting and custom aluminum and renovated concrete bleacher systems accompany both fields.
-
Upper Tier One Synthetic Turf MP Stadium Field with Bleachers
-
Lower Tier Large Multi-Field MP Synthetic Turf Configuration for Baseball, Softball, Football, Soccer, Field Hockey and Lacrosse with Concrete Stadium Seating and Block Dug Outs
-
New 5 Court Competition Tennis Facility