Project Overview
This Danville Area School District elected to award this project directly utilizing the KPN Cooperative Purchasing Program in lieu of going through the standard public sealed bid process. The complete turnkey stadium renovation was completed in 2017.
The state of the art stadium renovation process included a new multipurpose synthetic turf field, new asphalt base for track configuration, new all-weather polyurethane outdoor running track surface, fencing and a ball stopper safety netting system. The project required substantial earthwork and an extensive underground storm water management system with a PVC lined loop drain to protect against sink-holes that are prone in this region due to underlying limestone geology in the area.
-
Complete Turnkey Construction of a New Multi-sport Synthetic Turf Field.
-
Complete Turnkey Construction of a New All Weather Polyurethane Out door Running Track.
-
New Chain Link Fence and Gates.
-
New Ball Stopper Safety Netting System.