Project Overview
The LandTek Group provided Stony Brook University with a top tier athletic training facility. This project features the construction of an indoor Legacy recreation center, including the fieldhouse and a synthetic turf field. The new athletic facility provides the Seawolves athletic teams with year-round training in all weather conditions. This Legacy facility is a tension fabric structure over a steel frame, measuring 320 ft. x 190 ft. and over 70 ft. tall. Project highlights include, year round temperature control and indoor Musco lighting system and a full netting system. The facility includes a support building structure which houses offices, sports equipment storage, locker rooms, and MEP equipment. The construction required a high level of site logistical planning with the design team, subcontractors and the needs of the athletic department.
-
Indoor Athletic Training Facility
-
Tension fabric structure over a steel frame
-
Musco lighting system